My Facebook friend Trevor Batstone has posted a rider’s eye view from the front of the new Evergreen Extension elevated train through Coquitlam and Port Moody, stopping at Lougheed Town Centre.
We’ve reported in the past on Evergreen Line construction and anticipated effects, most recently in October 2016. The line opened in December. After a late reconfiguration, the track from Coquitlam City Hall (Lafarge Lake/Douglas) to Lougheed Town Centre has been renamed the Millennium Line, Evergreen Extension. The traveller gets a close look at the extensive high-rise development that has been mentioned on this site.
The train continues through Burnaby, (that is, beyond where the video takes us). With a transfer to the Expo Line at Broadway/Commercial the trip from Lafarge Lake to downtown Vancouver takes about 45 minutes.